| 1 |
20551607-RU-SO |
HORMIGÓN SIMPLE EN COLUMNAS F'C=2... |
16 |
Metro Cúbico |
150.67 |
HORMIGON PREMEZCLADO |
| 2 |
20551604-RU-SO |
ACERO DE REFUERZO FY=4200 KG/CM2 |
7891 |
Kilogramo |
1.91 |
ACEROS REDONDOS |
| 3 |
20551628-RU-SO |
HORMIGÓN SIMPLE RIOSTRAS F´... |
2 |
Metro Cúbico |
146.53 |
HORMIGON PREMEZCLADO |
| 4 |
20551627-RU-SO |
DERROCAMIENTODE MAMPOSTERÍA DE BL... |
196 |
Metro Cuadrado |
4.31 |
RELLENOS |
| 5 |
20551626-RU-SO |
PUERTA CORREDIZA METÁLICA CON MAL... |
9 |
Metro Cuadrado |
43.52 |
ROLLO DE MALLA PARA CERRAMIENTO |
| 6 |
20551625-RU-SO |
HORMIGÓN CICLÓPEO60por cie... |
20 |
Metro Cúbico |
190.11 |
HORMIGON PREMEZCLADO |
| 7 |
20551624-RU-SO |
ACERO ESTRUCTURAL A-36 PERFILES (INC. PI... |
382 |
Kilogramo |
4.11 |
PERFILES DE ACERO CONFORMADOS EN FRIO CO... |
| 8 |
20551623-RU-SO |
MALLA ELECTROSOLDADA 100X100X6.0 MM INC.... |
250 |
Metro Cuadrado |
7.14 |
MALLA ELECTROSOLDADA PARA REFUERZO DE HO... |
| 9 |
20551622-RU-SO |
CERRAMIENTO PROVISIONAL H=2.4 M CON SAR&... |
105 |
Metro |
7.80 |
PIEZAS DE MADERA USADAS CON FINES ESTRUC... |
| 10 |
20551621-RU-SO |
DESALOJO A MÁQUINA CON EQUIPO: CA... |
93 |
Metro Cúbico |
5.74 |
RELLENOS |
| 11 |
20551620-RU-SO |
REJILLA DE PISO 4" ALUMINIO |
10 |
Unidad |
7.99 |
TUBERIAS DE AGUAS NEGRAS |
| 12 |
20551619-RU-SO |
BAJANTE DE AGUAS LLUVIAS 110 MM. (INCL.... |
64 |
Metro |
13.28 |
TUBERIAS DE AGUAS NEGRAS |
| 13 |
20551618-RU-SO |
PINTURA ELASTOMÉRICA (EXTERIOR/IN... |
383 |
Metro Cuadrado |
5.39 |
PINTURA |
| 14 |
20551617-RU-SO |
ENLUCIDO VERTICAL LISO EXTERIOR CON IMPE... |
383 |
Metro Cuadrado |
8.79 |
PIGMENTOS PREPARADOS, OPACIFICANTES PREP... |
| 15 |
20551616-RU-SO |
MAMPOSTERÍA DE BLOQUE PRENSADO PE... |
727 |
Metro Cuadrado |
14.50 |
BLOQUES |
| 16 |
20551615-RU-SO |
MALLA ELECTROSOLDADA 100X100X6.0 MM INC.... |
373 |
Metro Cuadrado |
7.14 |
MALLA ELECTROSOLDADA PARA REFUERZO DE HO... |
| 17 |
20551614-RU-SO |
HORMIGÓN SIMPLE EN LOSA MACIZA DE... |
65 |
Metro Cúbico |
153.62 |
HORMIGON PREMEZCLADO |
| 18 |
20551613-RU-SO |
ENCOFRADO/DESENCOFRADO METÁLICO P... |
623 |
Metro Cuadrado |
10.56 |
PIEZAS DE MADERA USADAS CON FINES ESTRUC... |
| 19 |
20551612-RU-SO |
CONTRAPISO H.S. F`C=180KG/CM2 H.S=6CM, P... |
157 |
Metro Cuadrado |
18.00 |
HORMIGON PREMEZCLADO |
| 20 |
20551611-RU-SO |
HORMIGÓN SIMPLE EN CADENAS F'C=21... |
6 |
Metro Cúbico |
138.44 |
HORMIGON PREMEZCLADO |
| 21 |
20551610-RU-SO |
RELLENO DE PIEDRA BOLA CIMENTACIÓ... |
43 |
Metro Cúbico |
18.33 |
RELLENOS |
| 22 |
20551609-RU-SO |
RELLENO COMPACTADO CON MATERIAL DE SITIO |
31 |
Metro Cúbico |
7.34 |
RELLENOS |
| 23 |
20551608-RU-SO |
ENCOFRADO/DESENCOFRADO CADENAS 0.20MX0.3... |
166 |
Metro |
12.83 |
PIEZAS DE MADERA USADAS CON FINES ESTRUC... |
| 24 |
20551606-RU-SO |
ENCOFRADO/DESENCOFRADO COLUMNAS 0.45MX0.... |
242 |
Metro |
21.00 |
PIEZAS DE MADERA USADAS CON FINES ESTRUC... |
| 25 |
20551605-RU-SO |
HORMIGÓN SIMPLE EN PLINTOS F'C=21... |
15 |
Metro Cúbico |
144.01 |
HORMIGON PREMEZCLADO |
| 26 |
20551603-RU-SO |
HORMIGÓN SIMPLE REPLANTILLO F&acu... |
6 |
Metro Cúbico |
130.61 |
HORMIGON PREMEZCLADO |
| 27 |
20551602-RU-SO |
MEJORAMIENTO DE SUELO - SUB BASE CLASE I... |
24 |
Metro Cúbico |
19.69 |
RELLENOS |
| 28 |
20551601-RU-SO |
EXCAVACIÓN MANUAL EN CIMIENTOS Y... |
123 |
Metro Cúbico |
14.01 |
EXCAVACIONES |
| 29 |
20551600-RU-SO |
DERROCAMIENTO DE ESTRUCTURA HORMIG&Oacut... |
8 |
Metro Cúbico |
46.84 |
RELLENOS |
| 30 |
20551599-RU-SO |
REPLANTEO Y NIVELACIÓN CON EQUIPO... |
237 |
Metro Cuadrado |
1.60 |
NIVELACION DE EMPLAZAMIENTOS |
| 31 |
20551598-RU-SO |
CERRAMIENTO PROVISIONAL H=2.4 M CON SAR&... |
19 |
Metro |
7.80 |
PIEZAS DE MADERA USADAS CON FINES ESTRUC... |